On the ground

A solar farm in consultation with the environment

ProjectsSolar farm Stoppelsoal - Burgum

Novar is busy realizing solar farm Stoppelsoal - Burgum. All this is done in close cooperation with Enerzjy Groep Burgum.

Want to know more about this project?

Mail for more information


52.000Solar panels on the ground
32 MWpPeak annual power
10.000Households provided

Why this solar farm?

The municipality of Tytsjerksteradiel falls within the Regional Energy Strategy (RES) Friesland. According to the drafted policy of the RES region Friesland, it aims to produce at least 3 TWh of renewable energy on land by 2030. In addition, the municipality of Tytsjerksteradiel has had research conducted into the future energy demand of Burgum and Noordburgum. To make both villages more sustainable there is a task of 47 hectares. With solar farm Stoppelsoal - Burgum we make an important contribution to achieving these goals. We look forward to positive decision-making around this process.

The location of the solar farm

The planned location is on the Koumarwei near Burgum and Noordburgum. In addition, the future solar farm borders the TenneT/Liander substation and the power plant in Burgum. Currently, the plan area is used as grassland.

How can residents participate?

Throughout the process, there is intensive cooperation with Energjz Groep Burgum. This is a local energy cooperative that represents the interests of the neighborhood. The energy cooperative intends to become 50% co-owner of the solar farm. As a result, income from the solar farm will be returned to the local environment. The energy cooperative is currently closely examining whether this step will actually be taken.

What is the added value of this solar farm?

As much as 40% of the planning area of the solar farm is uncovered. In this way we are largely complying with the basic principle of the 'code of conduct on solar on land'. This code of conduct stipulates that at least 25% of the planning area of a solar farm must be uncovered.

In addition to the participation of local residents and the energy cooperative, Landschapsbeheer Fryslân, the Frisian Environmental Federation and Wetterskip Fryslân were also closely involved in several design sessions during the creation of the solar park design. Furthermore, Novar is paying a lot of attention in the design to the landscape integration, and there is a strong focus on strengthening the ecological value in and around the solar farm. Added value has also been applied in the recreational area, and a new bicycle path will be constructed through the solar farm. Finally, Novar is installing an educational point with, among other things, information about the solar farm, energy transition and ecological enhancement.

energy cooperatives

How does this solar farm contribute to the energy transition?

Solar farm Stoppelsoal - Burgum is about 35 hectares in size and further counts about 52,000 solar panels. This amount of solar panels accounts for a generated capacity of 32 MWp. Thus, more than 10,000 households can be provided with green energy every year!

Our process

Where are we now?

1

Design

2

Permit

3

Funding

4

Construction

5

In use

At the end of May 2023, the permit was applied for with the municipality of Tytsjerksteradiel. This means that we are one step closer to the realization of the solar farm.

Novar Novar
"Let's talk a little less, but above all hurry up with this kind of development."
Students of the CSG Liudger in Burgum
Novar Novar

Last edited January 19, 2024

Also view

On the ground Storage
On the ground
On the ground Storage

Want to tackle this challenge together?

Do you want to work with us, do you have questions or do you want to pass on a change? Then contact us – we’re happy to help.

Contact us

Contact us – we’re happy to help.

Contact

Get in touch

Questions? Call or email us.

Contact